FORD SCORPIO

1985-1994 of release

Repair and car operation



Ford Skorpio
+ 1.1. Car identification
+ 2. Maintenance service
- 3. Engines
   + 3.1. Engine OHC
   + 3.2. Engine DOHC
   + 3.3. Engine V6
   + 3.4. Ignition and engine management systems
   - 3.5. Diesel engines
      3.5.1. A technical characteristics
      3.5.2. The repair which is not demanding removal of the engine
      3.5.3. Check and adjustment of backlashes of valves
      - 3.5.4. Fuel system
         3.5.4.1. Atomizers
         3.5.4.2. Candles накаливания
         3.5.4.3. Compression check
         3.5.4.4. Removal of air from fuel system
         3.5.4.5. Removal and installation of the fuel pump
         3.5.4.6. Check and adjustment of turns of idling
         3.5.4.7. A cable of increase in turns of idling
      + 3.5.5. A head of the block of cylinders
      3.5.6. Removal and engine installation
      + 3.5.7. Dismantling, repair and engine assemblage
      3.5.8. Турбокомпрессор
      + 3.5.9. Greasing system
      + 3.5.10. Cooling system
      3.5.11. Typical malfunctions of the engine
+ 4. Cooling system
+ 5. Fuel system
+ 6. Coupling
+ 7. Transmissions
+ 8. A kardannyj shaft and the back bridge
+ 9. A steering
+ 10. Suspension brackets
+ 11. Brake system
+ 12. Wheels and tyres
+ 13. A body
+ 14. An electric equipment


b087f616

3.5.4.7. A cable of increase in turns of idling
THE GENERAL DATA

For maintenance of steady work of the engine at start of the cold engine and in the course of warming up the special device of increase in turns of the idling, operating the pump of a high pressure by the gauge through a cable is used.

Place of connection of a cable of increase in turns of idling to the lever, an adjusting nut and a counternut

1 – a place of connection of a cable of increase in turns of idling,

2 – an adjusting nut,

3 – a counternut

Removal

PERFORMANCE ORDER
1. To remove a clip on the end of a cable of increase in turns of idling and to remove a cable from the lever.
2. To unscrew a cover of a cable from the pump.
3. To unscrew from a head of the block of cylinders the management gauge together with a cable.

Installation

PERFORMANCE ORDER
1. To screw in in a head of the block of cylinders the management gauge together with a cable and a new copper sealing ring.
2. To warm up the engine to working temperature.
3. To establish a cable cover in the holder and to fix a cable on the lever by means of a clip.
4. To adjust the adjusting screw on a cover of a cable a cable tension so that a cable had люфт about 2 mm then to tighten a counternut of fastening of a cover of a cable.