|  1. To establish semiaxial gear wheels together with new adjusting linings with the thickness which has been picked up according to earlier measured backlashes. | 
 
 
 | 2. To establish satellites together with basic linings and an axis. | 
 
 
 |  3. To heat up a conducted gear wheel of the main transfer (by its lowering in hot water) and to put on it a differential box.    | 
 
 
 | 4. To provide a normal centering by installation of four bolts of fastening. | 
 
 
 | 5. After adjustment of installation of gear wheels of the main transfer (subsection 8.3.6 see) to establish differential bearings. |