FORD SCORPIO

1985-1994 of release

Repair and car operation



Ford Skorpio
+ 1.1. Car identification
+ 2. Maintenance service
- 3. Engines
   - 3.1. Engine OHC
      3.1.1. A technical characteristics
      - 3.1.2. Service and repair
         3.1.2.1. Engine adjustment
         - 3.1.2.2. The repair which is not demanding removal of the engine
            3.1.2.2.1. Removal and installation of a gear belt
            3.1.2.2.2. Removal of a head of the block of cylinders
            3.1.2.2.3. Dismantling and assemblage of a head of the block of cylinders
            3.1.2.2.4. Installation of a head of the block of cylinders
            3.1.2.2.5. Removal and installation of the oil pallet
            3.1.2.2.6. Replacement of a forward sealing ring of a cranked shaft
            3.1.2.2.7. Replacement of a back sealing ring of a cranked shaft
            3.1.2.2.8. Replacement of support of the engine
         3.1.2.3. Removal and engine installation
         + 3.1.2.4. Engine repair
         3.1.2.5. Greasing system
         3.1.2.6. Ventilation system картера
   + 3.2. Engine DOHC
   + 3.3. Engine V6
   + 3.4. Ignition and engine management systems
   + 3.5. Diesel engines
+ 4. Cooling system
+ 5. Fuel system
+ 6. Coupling
+ 7. Transmissions
+ 8. A kardannyj shaft and the back bridge
+ 9. A steering
+ 10. Suspension brackets
+ 11. Brake system
+ 12. Wheels and tyres
+ 13. A body
+ 14. An electric equipment


b087f616

3.1.2.2.5. Removal and installation of the oil pallet

Removal

PERFORMANCE ORDER
1. To remove a negative wire from the accumulator.
2. To lift and fix a forward part of the car.
3. To remove protection картера and to merge engine oil.
4. To remove a starter.
5. To unscrew two nuts of fastening of arms of the engine to support.
6. To weaken bolts карданного the hinge of a steering shaft, having provided their mutual mobility.
7. To remove brake tubes from clips on a forward crossbeam. To hook on the engine the load-lifting mechanism and to raise so that the engine weight was perceived by the load-lifting mechanism.
8. To establish a jack under a forward beam, to remove bolts of support of a beam and cautiously lowering a jack, to lower a beam.
9. To unscrew 23 bolts of fastening of the pallet and to remove the pallet.
10. To remove a lining of the oil pallet.

Installation

PERFORMANCE ORDER
1. To put hermetic on corners of adjusting surfaces of forward and back consolidations and to establish consolidations in flutes of a cover of the back bearing and a cover of the forward bearing of a cranked shaft.
2. To put hermetic on an interfaced surface on the block of cylinders, to establish a pallet lining on the block of cylinders, having hooked on the lining ends for the bottom part of consolidations.
3. To establish the oil pallet and to tighten bolts the demanded moment. Bolts to tighten on a circle the moment of 1-2 Nanometers, beginning from a point And, then the moment of 6-8 Nanometers, beginning from a point In, and definitively to tighten the moment of 8-10 Nanometers in 20 minutes of work of the engine.