FORD SCORPIO

1985-1994 of release

Repair and car operation



Ford Skorpio
+ 1.1. Car identification
+ 2. Maintenance service
+ 3. Engines
+ 4. Cooling system
+ 5. Fuel system
+ 6. Coupling
+ 7. Transmissions
+ 8. A kardannyj shaft and the back bridge
+ 9. A steering
+ 10. Suspension brackets
- 11. Brake system
   11.1. A technical characteristics
   + 11.2. Forward brakes
   + 11.3. Back brakes
   11.4. Adjustment of a manual brake
   11.5. Removal of air from brake system
   - 11.6. Antiblocking system
      11.6.1. Functioning check
      11.6.2. Removal and installation of hydraulic knot of management
      11.6.3. Removal and installation of a brake pedal
      11.6.4. Removal and installation of the accumulator of hydraulic knot
      11.6.5. Removal and installation of the pump and the engine of hydraulic knot
      11.6.6. Replacement of the gauge of speed of rotation of a forward wheel
      11.6.7. Replacement of the gauge of speed of rotation of a back wheel
+ 12. Wheels and tyres
+ 13. A body
+ 14. An electric equipment


b087f616

11.6.2. Removal and installation of hydraulic knot of management
THE GENERAL DATA

Hydraulic knot


Place of fastening of the tyre of grounding on hydraulic knot

Removal

PERFORMANCE ORDER
1. To switch off ignition.
2. To lower pressure in hydraulic system.
3. To remove a sheet casing of hydraulic knot of management.
4. To disconnect sockets of electric wires from hydraulic knot of management (1 – a socket of knot of electromagnetic valves, 2 – a socket of the main electromagnetic valve, 3 – a socket of the gauge of fires of braking, 4 – a socket of the hydraulic pump).
5. To clean by means of a syringe a brake liquid from a tank.
6. To disconnect hydraulic pipelines from management knot.
7. To close corresponding заглушками apertures in pipelines and картере hydraulic knot of management.
8. To remove a floor covering under a brake pedal.
9. To unscrew bolts (are specified by arrows) fastenings of hydraulic knot of management.
10. To remove hydraulic knot.

The prevention

After removal of hydraulic knot of management not to touch a pusher core.


Installation

PERFORMANCE ORDER
1. For installation of hydraulic knot of management it is necessary to execute actions in return sequence in relation to process of its removal.
2. After installation of hydraulic knot of management it is necessary to remove air from brake system (subsection 11.5 see).